 |
Direct access |
|
|
|
|
|
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
 |
 |
 |
 |
 |
 |
 |
|
|
The CIPM MRA was signed on:
14 October 1999
by: Arnold LEITNER (Director of the Metrology Department,
BEV)
|
|
|
Signatory NMI:
Bundesamt für Eich- und Vermessungswesen
(BEV), Vienna
 Designated institute(s):
For humidity and air velocity:
E+E Elektronik
(E+E), Engerwitzdorf
For concentration of ozone in ambient air:
Umweltbundesamt GmbH
(EAA), Vienna
(from 2 October 2009)
|
|
Search for calibration and measurement capabilities (CMCs) in the following fields declared in Appendix C of the CIPM MRA:
|
 |
|
 |
 |
|
 |